Norwich Electrical approached Spartek to fit a solar installation for Holton St Peter Primary School early years. We were thrilled to be part of the project and work for another well-known local electrician firm.

Solar

Norwich Electrical approached Spartek to fit a solar installation for Holton St Peter Primary School early years. We were thrilled to be part of the project and work for another well-known local electrician firm.

Norwich Electrical is a contracting firm operating across East Anglia, offering a wide range of electrical services for domestic, commercial, and industrial clients. The installation was to take place at Holton St Peter Primary School. The school is small, nestled in the scenic village of Holton, just outside Halesworth in Suffolk. The school is at the heart of its community, serving the villages of Holton, Blyford, Mells, and parts of Sotherton.

Spartek specialises in solar installations for schools and government educational centres. We understand the importance of a smooth install so as not to disrupt the school – but it’s also great when children ask some questions about the “electrics” and where electricity comes from!

The project was for the installation of a 4.74kWp Solar PV System to reduce the school’s future consumption of expensive grid-supplied electricity and reduce their carbon emissions.

The project was a great success; the school is enjoying a significant reduction in energy costs, allowing the school to save additional funds that can be put to use for the further education of the children. As you can see from the pictures, the install looks fantastic. We are happy to provide quotes for any educational provider such as schools, high schools, colleges, universities, academies, or any special schools.

Project Aim:
  • 12 x 395w Mono Black Solar Panels
  • 1 x 5kW Huawei Hybrid Battery Ready Three-Phase Inverter
  • Set up of Free Remote Monitoring
  • Flat Roof Ballasted Mount System
  • MCS Certificate
  • All DC & AC components
  • Metering Equipment
  • Test & Commissioning
  • G98/G99 Pre & Post Connection Notification
Project Details:

Reduce the future consumption of expensive grid supplied electricity and reduce carbon emissions.

Project Performance

Installation of a 4.74kWp Solar PV System.